No | Project Titles |
1 |
Sg. Merbok Pollution Prevention and Water Quality Improvement Study
|
2 |
Integrated Environmental Study for the Proposed Coastal Developments in Labuan
|
3 |
Review of Coastal Aspects for the National Water Resources Study (2000-2050) and Formulation of National Water Resources Policy
|
4 |
Integrated River Basin Management Study for Sg Perak
|
5 |
River Protection Input for Preliminary Environment Impact Assessment for Electrification Double Track Project from Gemas to Johor Bahru for ASPEC
|
6 |
APEC SCE02-2010. Independent Assessment of APEC Fisheries Working Group & Marine Resource Conservation Working Group
|
7 |
Detailed EIA for the Proposed Construction of Breakwater, Capital Dredging and other Ancillary Works for the New Deepwater Terminal at Kuantan Port, Pahang
|
8 |
Design Consultancy Services for guide/awning piles to accommodate 2 Nos. Patrol Boats at Mukim Losong, Sabah.
|
9 |
Jet docks Docking System for Marine Police Jetty, Terengganu & Kelantan
|
10 |
Desktop Study of Coal Import Facilities at East Coast of Peninsula Malaysia taking into account Climate Change Impact for TNBR
|
11 |
Options Study for Proposed Kapar Power Station Cooling System Cooling Water System
|
12 |
Site Suitability Study for New Gas Power Plant at Ranca-Ranca, Labuan
|
13 |
Proposed Design of River Protection Works for East Coast Rail Link
|
14 |
DOE Guideline for Reclamation, Dredging and Port
|
15 |
Marine Traffic & Navigational Safety Study for DEIA for the Proposed Reclamation for Development of Oil & Gas Industrial Base in Kg. Rancha-Rancha, Labuan
|
16 |
Sungai Langat Water Abstraction Studies for Megasteel Sdn Bhd - River Navigation Study Component for ASPEC
|
17 |
Proposed Preliminary Design of River Protection Works Fuk Teng K'ung Temple, Kuching, Sarawak
|