Technical Coordination

Technical Coordination

No Project Titles
1
Sg. Klang River Basin Flood Mitigation and Maintenance Scheme
2
Design and Construction Supervision For Sg. Kelantan Flood Mitigation Works at Kota Bahru East River Bank Stretch
3
Design Engineering Services for Hulu Terengganu Hydro Electric Power Dam Scheme
4
Accreditation of ESSAR Eng Drawings for Phase 1A of 15MTPA Iron Ore Distribution Centre of M/S Vale at Teluk Rubiah, Lumut
5
River of Life - Institutional and Legal Assessment for ASPEC Study
6
Design of River Bank Flood Protection Works at Johan Setia, Klang

TOP

A PHP Error was encountered

Severity: Notice

Message: fwrite(): write of 34 bytes failed with errno=122 Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 263

A PHP Error was encountered

Severity: Warning

Message: session_write_close(): Failed to write session data using user defined save handler. (session.save_path: /var/cpanel/php/sessions/ea-php74)

Filename: Unknown

Line Number: 0