No | Project Titles |
1 |
Water Availability Study at Hartalega Water Intake Point, Bestari Jaya, Selangor
|
2 |
Water Availability Study for the Proposed Hill Resort at Lot 2875, Selangor
|
3 |
Cadangan Pelan Induk Pembangunan Projek Taman Kekal Pengeluaran Makanan (TKPM) di Langkawit Papar, Sabah
|
4 |
Water Availability Study for Hartalega NGC at Sg Labu Water Intake Point
|
5 |
Water Resources Study for the Proposed 2 X 300 MW Coal- Fired Power Plant At Buroi, Balingian, Mukah Division, Sarawak
|
6 |
Water Availability Study for Hartalega NGC at Sg Langat Water Intake Point
|
7 |
Water Resources Study for the Proposed Palm Oil Mill at Mile 48, Jalan Nabawan, Nabawan-Keningau, Sabah
|
8 |
Re-assessment of the Water Availability of Sg Kubang Badak and the Water Demand at Hartalega Intake Point, Bestari Jaya, Selangor
|
9 |
Detailed Design, Tender Preparation & Construction Supervision for NGC Package 1 Works (Sg Labu Intake, Pump Station, & Piping System for Raw Water & Effluent Discharge)
|
10 |
Water Resources Study for the Proposed Pig Farming Area at Jalan Telupid-Tongod, Tongod District, Sabah
|
11 |
Development of Semenyih Dam Storage Prediction Model
|
12 |
Preliminary Water Resources Study for Fonterra Dairy Plant, Shah Alam, Selangor
|
13 |
Environmental Flow Study for the Proposed New Palm Oil Mill at Beaufort, Sabah
|
14 |
Water Availability Study for the Proposed Asia Pacific Glove Factory Water Intake at Labu
|
15 |
Water Availability Study for Potential WTP Intake Options for Rural Water Supply Scheme at Kokol Hill Area, Kota Kinabalu, Sabah
|
16 |
Water Availability Study for Pitas WTP-2, Sabah
|
17 |
Pre-feasibility Study for Sg Linggi Bunded Storage System
|
18 |
Water Availability Study for the Proposed 280 Acres Development Project in Gotong Jaya, Mukim Bentong, Pahang
|
19 |
Water Availability Study for the Proposed Upgrading of Sekuau WTP in Sibu, Sarawak
|
20 |
Water Resource Assessment to determine the most plant suitable location to relocate the existing Water Intake for the Rasau Water Treatment
|
21 |
Detailed Design for Gemas WTP Raw Water Intake Upgrading Works, Negri Sembilan
|
22 |
Raw Water Source Development and Transfer System for Batu Kitang Treatment Plant, Kuching
|
23 |
Development of the Water Balance System for Sg Bernam Basin under the Phase-1 of National Water Resources Management Program
|
24 |
Review of The National Water Resources Study and Formulation of National Water Resources Policy
|
25 |
Integrated Environmental Monitoring Plan (IEMP) of Lojing, Kelantan
|
26 |
Dam Safety Review for Gerugu Dam: Hydrological Review, Reservoir Storage and Yield Review, Storage Prediction Model, Dam Break Study, Emergency Response Plan, Dam Safety Inspection & Review
|
27 |
Preliminary Impact Assessment of Climate Change on Irrigation and Water Supply Scenario for Selected Keys Areas in Peninsular Malaysia
|
28 |
Integrated Water Resources Study for the Northern Region of Peninsular Malaysia
|
29 |
Experts Input for the Development of Integrated Water Resources Information Management System for DID Malaysia, KL
|
30 |
Rainwater Harvesting for Foam Packaging Industries Sdn Bhd, Selangor
|
31 |
Kerja-Kerja Meningkatkan Sumber Air Mentah di Loji Rawatan Air Gemas, Negeri Sembilan.
|
32 |
Kajian dan Pengambilan Tanah Bagi Skim Bekalan air Lembangan Sg. Linggi (Bunded Storage), Negeri Sembilan
|
33 |
Investigation,Survey, Design, Tender Documentation and Construction Supervision of the Miri Water Supply Source Development in Miri, Sarawak
|
34 |
Feasibility Study for the Proposed Raw Water Source Development and Raw Water Transfer System for the Board's Batu Kitang Water Treatment Plant Complex
|
35 |
Proposed Groundwater Well Construction, Development and Supply at Berjaya City Industrial Zone (Lot 25), Mukim Sungai Tinggi, Daerah Hulu Selangor, Selangor Darul Ehsan.
|
36 |
Sg. Labu & Sg. Langat Intakes, Pump Stations, Piping System for Raw Water and Effluent Discharge And Associated Works
|
37 |
NGC Raw Water Source Works (Relocation of Sg. Langat Intake, Pump Station, and Associated Raw Water Pipe).
|
38 |
Feasibility Study for the Proposed Development of Betong Raw Water Source, Bahagian Betong, Sarawak
|
39 |
Tailing Dam Engineering for Tawau Gold Mine
|
40 |
Hydrology, Hydraulic and Water Quality Assessment for LUAS and EIA Submission for GS Paper & Packaging Sdn Bhd
|
41 |
Proposed Groundwater Well Construction, Development and Supply at Berjaya City Industrial Zone (Lot 25), Mukim Sungai Tinggi, Daerah Hulu Selangor, Selangor Darul Ehsan.
|