No | Project Titles |
1 |
DEIA for the Proposed Tekai Dam, Pahang
|
2 |
Hydraulic & Hydrology Study for RHT Tailings Ponds
|
3 |
Hydrological & Hydraulic Analysis & Water Quality Assessment and Modelling for the Proposed 1,000 ha Integrated Shrimp Aquaculture Park (I-SHARP) in Setiu, Terengganu
|
4 |
Study on Integrated Management Plan for Bengoh Water Catchment Area
|
5 |
Hydrology & Hydraulic Review for Tunjang & Kodiang Station - Electrified Double Track Project Between Ipoh & Padang Besar
|
6 |
Proposed Jesselton Hill Mixed Development at Mile 13, Tuaran Road, Menggatal, Kota Kinabalu, Sabah
|
7 |
Feasibility Study and Detailed Engineering Design for "Upgrading of the Water Supply System for Lahad Datu"
|
8 |
Hydrological & Hydraulic Review on Deck Drainage MRT Line
|
9 |
Hydrology and Hydraulic Study for the Proposed Gold Mine at PT20- 13100442 (1000 Ha) in Tawau, Sabah
|
10 |
Pre-feasibility Study for Lebir & Nenggiri Dam
|
11 |
Study of the Impact of Pond Filling for mix development at Lot 5318 & Pond B, Dengkil
|
12 |
Preliminary Study on the Suitability for oil Palm Cultivation in Lampong SIL Plantation, Sumatra
|
13 |
Hydrology and Hydraulic Analysis for Lower Seletar Canal
|
14 |
Review of the Flood Mitigation Project of PT Laras Estate, Sumatera, Indonesia
|
15 |
Hydrology & Hydraulic Study on the Proposed High Speed Rail (HSR) RDC06
|
16 |
EIA for the Proposed Resort Development at Pulau Bohey Dulang, Semporna, Sabah
|
17 |
Sg Keta River Diversion Study for Iron Ore Mining, Pahang
|
18 |
Detailed Design of Phase-2 Miri Water Supply Scheme
|
19 |
Feasibility Study for the Proposed Development of Betong Raw Water Source, Sarawak
|
20 |
Special Environmental Impact Assessment (SEIA) for the Proposed Kota Kinabalu Water Supply Phase III, Sabah
|
21 |
Cadangan Pembangunan Perumahan Bercampur dan Perniagaan, di atas Lot 39, Beranang, Selangor untuk Setia Ecohill 2 Sdn. Bhd. - Review of Pond Design
|
22 |
Design Review (II) of the Flood Mitigation Project for PT Laras Estate, Sumatera, Indonesia
|
23 |
Hydrology and Hydraulic Design of Electrified DoubleTrack Railway from Sg. Petani to Padang Besar
|
24 |
Expert Opinion on the failure of the Box Culvert at Mandahan, Sabah
|
25 |
Integrated Environmental Impact Assessment (EIA) Study for the Proposed Coastal Developments in Labuan
|
26 |
Flood Investigation and Assessment for the newly constructed bridge across Sg Batu at Manjung Perak
|
27 |
Hydrology and Hydraulic Study for the Existing Sg Asap WTP Intake, Kapit Division, Sarawak
|
28 |
Ponds Assessment for the Mixed Development at Petaling Selangor
|
29 |
Hydrological & Hydraulic Review on Deck Drainage MRT Line - Long Span Crossing
|
30 |
Hydraulic Review of As-Built Drainage at Lot PT 10660, Puncak Alam
|
31 |
Assessment of the river flooding Potential for the Proposed Bintulu Kemena Road in Bintulu
|
32 |
Hydraulic and Hydrology Study to determine the 100-year Flood Level at Kota Bayu Emas, Klang, Selangor
|
33 |
Kajian dan Pengambilan Tanah bagi Skim Bekalan Air Lembangan Linggi (Bunded Storage), Negeri Sembilan.
|
34 |
Hydrology and Hydraulic Study for the Proposed Development at Lot 1797/1798, Mukim Ulu Yam, Selangor
|
35 |
Hydrology Analysis and Spillway Conceptual Design for the Tawau Gold Mine Tailing Dam, Tawau, Sabah
|
36 |
Preliminary Hydrology and Hydraulic Study for the Proposed East Coast Rail Link (ECRL) Package 4: Gombak to Bentong
|
37 |
Preliminary Hydrology and Hydraulic Study for the Proposed East Coast Rail Link (ECRL) Package 2: Dungun to Kuantan
|
38 |
Hydrology and Hydraulics Study for the LRT-3 Construction Works within Sg Kayu Ara, Damansara, Petaling
|
39 |
Detailed Hydrology and Hydraulic Design for the Proposed East Coast Rail Link (ECRL) Package 4: Gombak to Bentong
|
40 |
Detailed Hydrology and Hydraulic Design for the Proposed East Coast Rail Link (ECRL) Package 2: Dungun to Kuantan
|
41 |
Hydrology and Hydraulic Study for the Proposed Recreational Ponds for the Development Project in Lapangan Kota, Seremban, Negeri Sembilan
|
42 |
Hydraulic Study for the MRT SSP (Line 2) construction work within Sg. Bunus corridor, KL
|
43 |
Shoreline Monitoring Program for the Biannual 4 (B4) and Biannual 5 (B5) of Prai 1071 MW Combined Cycle Gas Turbine (CCGT) Project, Penang
|
44 |
Hydraulic Study for the Application of Planning Permission for 220 acres Mixed Development in Bandar Lunas, Seksyen 11, Daerah Kulim, Kedah
|
45 |
Hydrology & Hydraulic Detailed Design for Kuala Lumpur-Singapore High Speed Rail (Package 4)
|
46 |
Sg. Perak Integrated River Basin Management Plan Development
|
47 |
Sg. Merbok Pollution Prevention and Water Quality Improvement Study
|
48 |
Water Availability and Water Quality Study for GS Paper Expansion Project for Submission to LUAS and DOE
|
49 |
Development of Integrated Lake Management Plan for Jor and Mahang Reservoirs
|
50 |
Dam Safety Review for Gerugu Dam: Hydrological Review, Reservoir Storage and Yield Review, Storage Prediction Model, Dam Break Study, Emergency Response Plan, Dam Safety Inspection & Review
|
51 |
Detailed EIA for the Proposed Salak Mixed Developments in Mukim Tanjung Dua Belas, Kuala Langat
|
52 |
Batang Lupar Salinity Study
|
53 |
Shoreline Monitoring Program for Prai 1071 MW CCGT Project, Penang
|
54 |
SEIA for Baleh Hydroelectric Project
|
55 |
SEIA for Baram Hydroelectric Project
|
56 |
Study of the Impacts of Land Development Activities on Water Resources of Sg. Kelantan and the Development of a Conservation Plan
|
57 |
Catchment Modelling and Sediment Impact Assessment for Kenyir Lake
|
58 |
Feasibility Study &Detailed Design of the Flood Mitigation Works for Kelantan River Basin
|
59 |
Investigation, Survey, Design, Tender Documentation and Construction Supervision of Miri Water Supply Source Development
|
60 |
Raw Water Source Development and Transfer System for Batu Kitang Treatment Plant, Kuching
|
61 |
Proposed Sg. Samalajau Reservoir and Associated Facilities
|
62 |
Feasibility Study & Detailed Design of Sg. Damansara Flood Mitigation Scheme, Selangor
|
63 |
Improvement of the Drainage System Along Jalan Sibiyu, Bintulu
|
64 |
Development of the Water Balance System for Sg Bernam Basin under the Phase-1 of National Water Resources Management Program
|