Hydrology and Hydraulic

Hydrology and Hydraulic

No Project Titles
1
DEIA for the Proposed Tekai Dam, Pahang
2
Hydraulic & Hydrology Study for RHT Tailings Ponds
3
Hydrological & Hydraulic Analysis & Water Quality Assessment and Modelling for the Proposed 1,000 ha Integrated Shrimp Aquaculture Park (I-SHARP) in Setiu, Terengganu
4
Study on Integrated Management Plan for Bengoh Water Catchment Area
5
Hydrology & Hydraulic Review for Tunjang & Kodiang Station - Electrified Double Track Project Between Ipoh & Padang Besar
6
Proposed Jesselton Hill Mixed Development at Mile 13, Tuaran Road, Menggatal, Kota Kinabalu, Sabah
7
Feasibility Study and Detailed Engineering Design for "Upgrading of the Water Supply System for Lahad Datu"
8
Hydrological & Hydraulic Review on Deck Drainage MRT Line
9
Hydrology and Hydraulic Study for the Proposed Gold Mine at PT20- 13100442 (1000 Ha) in Tawau, Sabah
10
Pre-feasibility Study for Lebir & Nenggiri Dam
11
Study of the Impact of Pond Filling for mix development at Lot 5318 & Pond B, Dengkil
12
Preliminary Study on the Suitability for oil Palm Cultivation in Lampong SIL Plantation, Sumatra
13
Hydrology and Hydraulic Analysis for Lower Seletar Canal
14
Review of the Flood Mitigation Project of PT Laras Estate, Sumatera, Indonesia
15
Hydrology & Hydraulic Study on the Proposed High Speed Rail (HSR) RDC06
16
EIA for the Proposed Resort Development at Pulau Bohey Dulang, Semporna, Sabah
17
Sg Keta River Diversion Study for Iron Ore Mining, Pahang
18
Detailed Design of Phase-2 Miri Water Supply Scheme
19
Feasibility Study for the Proposed Development of Betong Raw Water Source, Sarawak
20
Special Environmental Impact Assessment (SEIA) for the Proposed Kota Kinabalu Water Supply Phase III, Sabah
21
Cadangan Pembangunan Perumahan Bercampur dan Perniagaan, di atas Lot 39, Beranang, Selangor untuk Setia Ecohill 2 Sdn. Bhd. - Review of Pond Design
22
Design Review (II) of the Flood Mitigation Project for PT Laras Estate, Sumatera, Indonesia
23
Hydrology and Hydraulic Design of Electrified DoubleTrack Railway from Sg. Petani to Padang Besar
24
Expert Opinion on the failure of the Box Culvert at Mandahan, Sabah
25
Integrated Environmental Impact Assessment (EIA) Study for the Proposed Coastal Developments in Labuan
26
Flood Investigation and Assessment for the newly constructed bridge across Sg Batu at Manjung Perak
27
Hydrology and Hydraulic Study for the Existing Sg Asap WTP Intake, Kapit Division, Sarawak
28
Ponds Assessment for the Mixed Development at Petaling Selangor
29
Hydrological & Hydraulic Review on Deck Drainage MRT Line - Long Span Crossing
30
Hydraulic Review of As-Built Drainage at Lot PT 10660, Puncak Alam
31
Assessment of the river flooding Potential for the Proposed Bintulu Kemena Road in Bintulu
32
Hydraulic and Hydrology Study to determine the 100-year Flood Level at Kota Bayu Emas, Klang, Selangor
33
Kajian dan Pengambilan Tanah bagi Skim Bekalan Air Lembangan Linggi (Bunded Storage), Negeri Sembilan.
34
Hydrology and Hydraulic Study for the Proposed Development at Lot 1797/1798, Mukim Ulu Yam, Selangor
35
Hydrology Analysis and Spillway Conceptual Design for the Tawau Gold Mine Tailing Dam, Tawau, Sabah
36
Preliminary Hydrology and Hydraulic Study for the Proposed East Coast Rail Link (ECRL) Package 4: Gombak to Bentong
37
Preliminary Hydrology and Hydraulic Study for the Proposed East Coast Rail Link (ECRL) Package 2: Dungun to Kuantan
38
Hydrology and Hydraulics Study for the LRT-3 Construction Works within Sg Kayu Ara, Damansara, Petaling
39
Detailed Hydrology and Hydraulic Design for the Proposed East Coast Rail Link (ECRL) Package 4: Gombak to Bentong
40
Detailed Hydrology and Hydraulic Design for the Proposed East Coast Rail Link (ECRL) Package 2: Dungun to Kuantan
41
Hydrology and Hydraulic Study for the Proposed Recreational Ponds for the Development Project in Lapangan Kota, Seremban, Negeri Sembilan
42
Hydraulic Study for the MRT SSP (Line 2) construction work within Sg. Bunus corridor, KL
43
Shoreline Monitoring Program for the Biannual 4 (B4) and Biannual 5 (B5) of Prai 1071 MW Combined Cycle Gas Turbine (CCGT) Project, Penang
44
Hydraulic Study for the Application of Planning Permission for 220 acres Mixed Development in Bandar Lunas, Seksyen 11, Daerah Kulim, Kedah
45
Hydrology & Hydraulic Detailed Design for Kuala Lumpur-Singapore High Speed Rail (Package 4)
46
Sg. Perak Integrated River Basin Management Plan Development
47
Sg. Merbok Pollution Prevention and Water Quality Improvement Study
48
Water Availability and Water Quality Study for GS Paper Expansion Project for Submission to LUAS and DOE
49
Development of Integrated Lake Management Plan for Jor and Mahang Reservoirs
50
Dam Safety Review for Gerugu Dam: Hydrological Review, Reservoir Storage and Yield Review, Storage Prediction Model, Dam Break Study, Emergency Response Plan, Dam Safety Inspection & Review
51
Detailed EIA for the Proposed Salak Mixed Developments in Mukim Tanjung Dua Belas, Kuala Langat
52
Batang Lupar Salinity Study
53
Shoreline Monitoring Program for Prai 1071 MW CCGT Project, Penang
54
SEIA for Baleh Hydroelectric Project
55
SEIA for Baram Hydroelectric Project
56
Study of the Impacts of Land Development Activities on Water Resources of Sg. Kelantan and the Development of a Conservation Plan
57
Catchment Modelling and Sediment Impact Assessment for Kenyir Lake
58
Feasibility Study &Detailed Design of the Flood Mitigation Works for Kelantan River Basin
59
Investigation, Survey, Design, Tender Documentation and Construction Supervision of Miri Water Supply Source Development
60
Raw Water Source Development and Transfer System for Batu Kitang Treatment Plant, Kuching
61
Proposed Sg. Samalajau Reservoir and Associated Facilities
62
Feasibility Study & Detailed Design of Sg. Damansara Flood Mitigation Scheme, Selangor
63
Improvement of the Drainage System Along Jalan Sibiyu, Bintulu
64
Development of the Water Balance System for Sg Bernam Basin under the Phase-1 of National Water Resources Management Program

TOP